View Single Post
Old 05-03-2009, 08:51 PM   #3
phasetim
Just me. .
 
phasetim's Avatar
Club Car
 
Join Date: Sep 2007
Location: Pensacola, FL
Posts: 1,092
Default Re: 4-12 volt Battery Pack Run Times compared to 6 8 volt

On my 48v discharging machine brand new 12v trojans make about 90 mins.. 60 mins is 2 rounds of golf..

brand new trojans or exides usually get about 140 mins..

brand new johnson controls get around 80 mins.

three years later the typical findings are 12v trojans about 45 mins, exide and trojan 8vs about 100 mins, and johnson controls 30 mins or so.. (or totally dead).

the 12vs dont have quite the same run time, and they are extremely sensitive to improper water sources.
phasetim is offline   Reply With Quote